Texas De Brazil – Abu Dhabi
March 1, 2018Address Hotel – Dubai
March 1, 2018
Burj Al Arab - Dubai
Our works included design, manufacture and installation of M.S structure for the connections of old island to new island, S.S floor trims along the curved edge of the whole island, M.S support for strengthening of old island boundary concrete blocks.